I am trying to set a optimization problem from JEplus. However, following what is suggested I wanted to use the alloutput.rvi from example file. However on my local simulation I could extract data from eplustble.html but non of the rvi that uses 'eplusout.eso' and 'eplusout.csv' have any results collected. Further, under the simulation folders I don't see any 'eplusput.csv' at all but eplusout.eso is present.
1. In the absence of eplusout.csv I extracted all my required values from eplustbl.csv. Does it make any difference?
If the above is also acceptable
2. My objective is to reduce the total annual cost and minimize peak electricity kWh and have minimum number of unmet hours from the simulation (while having minimum warnings).
Does this mean I have to have 3 objective?
I have the following from the reults file
Obj1--number of unmet hours hrs---C1
Obj2-- Annual cost $ ---C17
Obj3-- Peak energy kWh ---C18
Do I need a constraint defined? what is scaling used for?
3. How to define objectives
As this is a minima or maxima problem, how can I pick the lower and upper bounds? Is this a simple guess between 0 and some value higher than I get from single simulation?
AllCombinedResults.csv file is attached.
1. In the absence of eplusout.csv I extracted all my required values from eplustbl.csv. Does it make any difference?
If the above is also acceptable
2. My objective is to reduce the total annual cost and minimize peak electricity kWh and have minimum number of unmet hours from the simulation (while having minimum warnings).
Does this mean I have to have 3 objective?
I have the following from the reults file
Obj1--number of unmet hours hrs---C1
Obj2-- Annual cost $ ---C17
Obj3-- Peak energy kWh ---C18
Do I need a constraint defined? what is scaling used for?
3. How to define objectives
As this is a minima or maxima problem, how can I pick the lower and upper bounds? Is this a simple guess between 0 and some value higher than I get from single simulation?
AllCombinedResults.csv file is attached.